Once you ve reached the ridge bend the shingle over the ridge so that each side is equal and nail it into place with a single nail on each side.
Peel and seal on top of shingle roofing installation.
This is because peel and stick underlayments are designed to be a permanent installation so when reinstalling over top of this type.
Installing peel and stick roll roofing on a flat roof requires a minimum slope of 1 2 inch per 12 inch roof run.
Mfm wind water seal mfm wind water seal low temperature peel seal peel seal spanish premium ht tile metal ridgeseal roof deck tape seal coat eifs shinglestarter stormstopper fsu subseal 40 and subseal 60 ultra ht wind water seal ultra ht wind water seal low temperature windowwrap products.
Do the same with the next shingle continuing this step until you get to the far edge of the ridge.
Peel seal is the original self stick roll roofing specifically designed for low slope residential and commercial applications.
Peel seal mfm building products corp.
Peel seal should be installed parallel to the slope of the roof.
Mfm recommends using two installers when using peel seal as a whole roof covering.
Installation should begin at the low point of the roof and proceed up the slopeshingle fashion so water does not flow against the laps.
Cut your last shingle on each row to size repeating all the way to the ridge.